| Kelly seeding about 3 acres of grass on the slope below the first free stall, to prevent erosion. |
| Herdsman driving cows down the hill towards the existing parlor. |
| We caught a glimpse of nature's beauty in this "rainbow spot" in the clouds. |
| Preparing parlor footings. |
| Load of pipe. |
| Pouring footings for the lower free stall. |
| Concrete crew. |
| "Footprint" of the lower free stall. |
| Dirt leveled and compacted for upper free stall. |
| Working on the upper free stall pad. |
| Chief Steel building |
| Loading dock with materials. |
| Gravel base for parlor basement footings. |
| Looking down on parlor footings and then further to lower free stall footings. |
| Gomaco paving machine, some equipment and materials. |
| Materials, lower free stall footings and a great ocean view. |
| Wire mesh for concrete pours. |
| Standing on the edge of the lower free stall looking down on the manure pit. |