Friday, June 13, 2014

Beginning of June


Footings on upper freestall.

Pouring footings.

Scraper drain boxes.

Heifer lanes prepared for Gomaco pour.

Gomaco - first pour completed.











Rock work completed.

Firerock in equipment room.

Equipment being installed in the basement.

Milking stalls.

Transfer lane from parlor to freestall.

Rain collection system.


Manure processing pit. Manure collected in pit and then pumped into composter.

Manure composter in action.

Bedding compost conveyor belt.

First compost product produced.


Compost building.





Conference room.

Conference room, ready for sheetrock.

Equipment room in the front of the parlor.