| Stripping the forms from the manure pit walls. |
| Inside the pit. |
| Loading dock poured and ready for materials being shipped. |
| Rebar, bent and tied, for reinforcement in the free stall and parlor footings. |
| Cutting rebar. |
| View from the new dairy site towards the manure pit. |
| Corner of the loading dock looking towards the upper free stall site. |
| Working and shaping the slope above the upper free stall. |
| Load of gravel delivered for the footings. |
| Footings in the first stage. |
| Digging the footings with framework standing by. |
| Footings |
| Completed footing form with pier support. |
| Beginning stages of footing with fabric placed and gravel on top. |
| Fabric placement in footing. |