| Standing the tilt walls on the new parlor. |
| Setting tilt up walls in the carousel area. |
| Preparing to install hydronic heat in the carousel floor. |
| Equipment room floor ready to be poured. |
| Concrete pier footings for the parlor. |
| Looking towards the existing parlor at the transfer lane. |
| Concrete flour poured in the equipment room. |
| Equipment room. |
| Pouring the floor of the carousel. |
| Looking down the holding pen from the carousel area. |
| Chemical room. |
| Milk room. |
| Beginning to pour the holding pen. |
| Installing sort pen fences. |
| Preparing the foot bath area. |
| Sort pen. |
| Flush valves on the left, carousel to be installed on the right. |
| Chief steel building. |