Standing the tilt walls on the new parlor. |
Setting tilt up walls in the carousel area. |
Preparing to install hydronic heat in the carousel floor. |
Equipment room floor ready to be poured. |
Concrete pier footings for the parlor. |
Looking towards the existing parlor at the transfer lane. |
Concrete flour poured in the equipment room. |
Equipment room. |
Pouring the floor of the carousel. |
Looking down the holding pen from the carousel area. |
Chemical room. |
Milk room. |
Beginning to pour the holding pen. |
Installing sort pen fences. |
Preparing the foot bath area. |
Sort pen. |
Flush valves on the left, carousel to be installed on the right. |
Chief steel building. |
Hi
ReplyDeletethis is really very helpful article. I go through this site really very nice information.thank for sharing such a nice information green home construction